Construction Hailey Hartigan Construction Hailey Hartigan

Fort Belvoir WIT Barracks

Fort Belvoir, VA
288 Units of Barracks for Soldiers Recovering from War Injuries


A Closer Look //

The Warriors in Transition Barracks project consists of two wood-framed barracks and a surrounding campus. This 240,000 facility provides lodging for soldiers who have been released from medical care and are in recovery for further evaluations. Each building includes 72 two-bedroom, two-bathroom units for a total of 144 units and a capacity of 288 beds. The design/build project includes features such as slab-on-grade concrete, wood framing, standing seam metal roof, brick exterior, hydraulic elevators, water-source heat pumps and cooling towers. The project will be LEED-Gold certified under the NCv2.2 rating system.

CBG understood the importance of providing Army personnel with both a top-notch training facility and a place that they would feel at home.
— Alexander Nowden, Ret. Army First Sergeant and USACE Construction Representative, Fort Lee
The AIT Barracks have set the bar for the rest of Fort Lee’s expansion.
— Alexander Nowden, Ret. Army First Sergeant and USACE Construction Representative, Fort Lee

 
Read More